AI review for electrical documents
Six focused products, each reviewing one kind of document against its own checklist — 263 checks in total, written by a Ph.D. electrical power engineer and IEEE 1584 voting member. Buying one does not buy an opinion on the others; pick the product that matches what you're actually submitting.
AI Arc Flash Study Review
A structured second look at your incident-energy study before it becomes a label.
Applies to: Incident energy study output, arc flash study reports, study input tables
54-point checklist · automated release
Label & PPE Boundary Review
Cross-check what your labels say against what your study says.
Applies to: Equipment arc flash labels, label schedules, boundary tables, PPE assignment tables
33-point checklist · automated release
AI NEC Pre-Check
A structured pass over your drawings before the plan checker sees them.
Applies to: Electrical drawings, one-line diagrams, panel schedules, riser diagrams, installation details
49-point checklist · automated or expert-reviewed
Coordination & Selectivity Review
Flags what needs verification in your protection settings — never a selectivity verdict.
Applies to: Protective device settings tables, coordination study narratives, TCC plot exports
31-point checklist · automated release
MOP Review
Structural completeness and cross-document consistency — never a go/no-go.
Applies to: Draft Methods of Procedure with a single-line diagram and a written scope of work
46-point checklist · automated or expert-reviewed
OLPD Report Review
Methodology and consistency review of your PD survey report — never a condition call.
Applies to: Online partial discharge survey reports for MV switchgear, cable, transformers, motors, generators, and busway
50-point checklist · automated or expert-reviewed
Require an Expert Review?
Personal Expert Review — an asynchronous written review, delivered as a memo. No live call, ever.
See Personal Expert Review →